SOP
BTA RMU-INS
|
|||
1
|
Periksa Bushing.
Pasang Copper.
|
|
|
2
|
ON semua Mechanism Z,T.
Periksa :
Switching Blade MASUK PENUH.
Pin Switching Blade Z,T : ada dan bengkok.
Seragam ikatan Spring Switching Blade Z,T.
Ikatan Main Busbar.
Ikatan Internal Parts.
Pastikan jarak Rotating Arc –
Fixed Contact Earth.
Moveable Cast Earth Z,T lancar.
OFF semua Mechanism Z,T.
|
|
|
3
|
EARTH ON semua Z,T Mechanism.
Pastikan Switching Blade MASUK PENUH.
Double Earthing Link OK.
OFF semua Z,T Mechanism.
|
|
|
4
|
Setting Mechanism Z,T OK.
4 pcs Nut diikat.
Drive Crank tiada freeplay.
Kedudukan Switching Blade di TENGAH.
Stopper (bawah) = 6 Conical Washer.
Laras Limiter Overshoot.
|
|
|
5
|
Pasang Kabel.
|
|
|
6
|
# BTA Z :
Tulis Tank No. dalam buku rekod
BTA.
Key in Tank No. dalam KONFIGURASI
RMU-INS.
( Test > Breaker Test Wizard
> Pilih Tank No.Terakhir >
Next > Next > Taip Tank No.
baru > Taip Feeder > Finish )
Key in Z-ˣ.
Pasang Rotary Transducer Set.
Calibrate Transducer : 2350 decimal.
Close Test.
Open Test.
|
|
|
7
|
# BTA T :
Key in T-ˣ.
Pasang Rotary Transducer Set.
Calibrate Transducer : 2350 decimal.
Close Test.
Open Test.
|
|
|
8
|
Tanggal Kabel.
Kemas Tools.
Air Blowing.
Lap habuk.
Pastikan tiada bolt, nut, bendasing,
pelekat, tertinggal dalam Tank.
|
|
|
9
|
Mechanical Test.
Continuity Test.
Contact Resistance Test.
Insulation Resistance Test.
|
|
|
10
|
Masukkan Testing Results dalam
sampul pada Tank.
|
|
|
25112015
|